Michael Edlen
HOME  |  CLASSIFIEDS  |   MAGAZINE LOCATIONS  |   CONTACT  |   ABOUT US  |   MEDIA KIT  |   ARCHIVES
Business

Contribute

Towns

Features

home > business > i-405 sunset bridge construction continues

I-405 Sunset Bridge Construction Continues

By Paulina Firozi  |  February 15, 2011

Artist Rendering provided by Metro.net Artist’s view from the southeast corner of Sunset and 405, looking northwest (upon completion).
Artist Rendering provided by Metro.net Artist’s view from the southeast corner of Sunset and 405, looking northwest (upon completion).

Brentwood locals are acutely aware of the terrible traffic that occurs on Sunset Blvd., especially during rush hours when it seems the whole town is headed home from work and school, each individual in his or her vehicle.
Sunset Boulevard is one the most frequented east-west roads on the Westside. 3,500 vehicles travel across the bridge during rush hour.
But the MTA says that once the bridge expansion project is completed in 2012, traffic should ease significantly. With the added lanes, there should be less gridlock as vehicles fight to get onto the 405’s on-ramps or to continue driving on Sunset.
The completed design will look as shown above and to the left. Other areas being reconstructed include the Mulholland Drive bridge, the Skirball Center Drive ramps and the Wilshire Boulevard ramps.


No comments have been provided.

Your Name:

Your Location:

Vote:

Your Comment:

Security check *

security image
 


Business Latest Headlines
All Headlines

Craig Gold
Golden Dragon
GHS
Andrew Waters Web and Graphics
Personalized Baby Blankets
new herb banner
Susman Homeowners
SUBMIT ARTICLE  |   ADD CALENDAR EVENT  |   CONTACT  |   MAGAZINE LOCATIONS  |   MEDIA KIT  |   JOIN MAILING LIST  |   ADVERTISE
BEVERLY HILLS 90210  |  WESTWOOD/BEL-AIR VIEW  |  BRENTWOOD NEWS  |  SANTA MONICA SUN  |  PALISADES 90272  |  MALIBU BEACH
© Copyright 2012, Westside Today, LLC., All Rights Reserved